Villa Renovation Dubai

Complete villa renovation and fit-out covering bathrooms, kitchens, flooring, ceilings, joinery, painting, MEP modifications and turnkey execution by ASM Interiors.

Kitchen renovation in Springs 15 Dubai by ASM Interiors
Full Villa Renovation
Kitchen & Bathroom Works
In-House Joinery
Detailed BOQ
Dubai-Based Execution Team

Complete Villa Renovation and Fit-Out Services in Dubai

ASM Interiors provides complete villa renovation and fit-out solutions across Dubai, managing the full scope from site inspection and planning through to execution, finishing and handover.

We work with villa owners, investors and property managers who need properly coordinated renovation works with clear BOQs, material guidance, in-house joinery production, MEP coordination and structured project management.

Our villa renovation projects commonly include bathrooms, kitchens, flooring, ceilings, lighting, wall finishes, wardrobes, custom joinery, painting, plumbing adjustments and electrical modifications.

  • Dubai-based contractor with 10+ years in residential renovation
  • In-house joinery workshop, manufactured in the UAE
  • Detailed BOQ issued before any work begins
  • Full scope management under one contract
  • Recent villa project completed in Springs 5, Dubai
  • One project manager from site visit to handover

Villa Renovation Services in Dubai

Full Interior Renovation

Complete villa upgrade covering demolition, finishes, MEP coordination, ceilings, joinery and handover. Managed under one contract with one point of contact.

Bathroom Renovations

Waterproofing, tiling, sanitaryware, vanity works, shower glass, plumbing and lighting. Full strip-out or selective upgrade depending on scope.

Kitchen Renovation

Custom cabinets, countertops, backsplash, appliance coordination, ceiling, electrical and plumbing works. Full kitchen scope from demolition to handover.

Flooring Replacement

Porcelain tiles, SPC flooring, marble, screeding, skirting and floor preparation across all villa areas and staircase zones.

Ceiling and Lighting Works

Gypsum ceilings, cove lighting, spotlights, LED profiles, access panels and painting. Coordinated with electrical and joinery works.

Custom Joinery

Wardrobes, walk-in closets, TV units, vanities, storage units, wall panels and bespoke furniture, all fabricated in our in-house UAE workshop.

Painting and Decorative Finishes

Wall and ceiling painting, feature walls, texture correction, microcement and specialist finishes applied where required. External painting to villa elevations, boundary walls, carports and porches is available where required.

MEP Modifications

Plumbing, drainage, electrical points, switch and socket relocation, lighting circuits and appliance connection points managed within the renovation scope.

Doors and Wall Openings

Internal door replacement, frame modification, architrave work, wall opening coordination and complete finishing to match surrounding surfaces.

Final Snagging and Handover

Site cleaning, detail correction, hardware adjustment, final inspection and handover support. All items resolved before documentation is issued.

Materials & Specification Options

ASM Interiors guides clients through material and finish selection with physical samples available before any commitment is made.

60x120 cm porcelain tiles
Large-format porcelain slabs
SPC flooring
Microcement finish
Premium washable paint
MR MDF joinery carcass
PU painted shutters
Veneer and laminate finishes
Quartz / porcelain / marble countertops
Hettich / Blum hardware
LED profiles and drivers
Grohe / Hansgrohe / RAK / Geberit sanitaryware
Schneider / Legrand switch and socket options
Frameless or framed shower glass
Gypsum ceiling systems

Villa Renovation Cost Guide in Dubai

Indicative ranges based on current Dubai villa renovation project pricing. Final cost depends on villa size, scope, material selection and site condition.

Villa Renovation TypeTypical ScopeBudget Range
Partial Villa RenovationSelected areas such as bathrooms, kitchen, painting, flooring or joineryAED 80,000 – 180,000+
Standard Villa RenovationKitchen, bathrooms, flooring, painting, ceiling updates, basic MEP adjustments and selected joineryAED 180,000 – 350,000+
Premium Villa RenovationFull interior renovation with custom joinery, upgraded finishes, lighting, bathrooms, kitchen and MEP coordinationAED 350,000 – 700,000+
Luxury Villa RenovationHigh-end materials, custom joinery throughout, large-format slabs, premium sanitaryware, specialist finishes and detailed project managementAED 700,000+

Indicative prices exclude 5% VAT unless specifically stated otherwise. Package ranges generally include labour, project supervision and the renovation works specifically listed in the approved scope and BOQ. Kitchens, bathrooms, flooring, ceilings, MEP modifications, joinery, approvals, appliances, furniture and specialist finishes are included only where expressly stated. Appliances and loose furniture are excluded unless specifically listed in the approved quotation. Final pricing depends on villa size, community and developer requirements, existing condition, demolition, kitchens and bathrooms, flooring, ceilings, MEP, joinery, finishes, access, NOCs and approvals, and the approved BOQ. A detailed BOQ is prepared after site inspection and measurement. Use our free renovation BOQ checklist or request a project consultation to get started. For a full tier-by-tier cost breakdown, see our Villa Renovation Cost Guide; for the complete renovation process and approvals, see our Villa Renovation Planning Guide.

Our Villa Renovation Process

Every villa renovation follows a structured sequence to ensure quality, accurate pricing and on-schedule delivery.

1

Site Visit and Condition Review

We visit the villa, assess current finishes, check MEP condition, identify structural constraints and record full measurements across all areas.

2

Scope Confirmation

We discuss the renovation requirements room by room, confirm what is included, identify any exclusions and agree the full scope before BOQ preparation.

3

Material and Finish Selection

We present tile options, paint selections, sanitaryware specifications, joinery finishes and hardware choices. All selections are confirmed in writing.

4

BOQ and Timeline Preparation

A detailed bill of quantities covering every trade, material and rate is issued. A project timeline is prepared and approved before work begins.

5

Authority and Building Coordination

Where required, we coordinate with building management, community authorities or NOC processes for works that require approvals before starting on site.

6

Demolition and MEP Works

Selective or full demolition carried out first. Plumbing, drainage and electrical modifications completed before wet area and ceiling works begin.

7

Ceiling, Flooring and Wet Area Works

Waterproofing, tiling, gypsum ceilings, SPC or stone flooring installed in the correct sequence across all areas. MEP first-fix integrated during this stage.

8

Joinery Fabrication and Installation

Wardrobes, kitchen cabinets, TV units and all custom joinery fabricated in our workshop and installed on site with hardware, lighting and accessories.

9

Painting, Final Fixing and Snagging

Painting and decorative finishes applied. All second-fix items including sanitaryware, switches, sockets, door hardware and accessories installed and checked.

10

Handover

Full snagging inspection with client present. All outstanding items resolved. Site cleaned and handover documentation issued after client sign-off.

Villa Renovation Approvals and NOCs in Dubai

What has to be approved before work starts depends on the community, the developer and the scope itself. A cosmetic refurbishment and a villa with structural or external changes do not follow the same route, so we confirm the requirements for each project rather than assume them.

Community or Developer NOC

Most gated communities and master developers require a no objection certificate and an approved contractor before site access is granted. This is usually the first step, and it also sets the permitted working hours, access route and site rules for the job.

Scope Decides the Route

Finishes, joinery and like-for-like replacement are treated differently from works that alter the structure, move wet areas or change the appearance of the villa from outside. The heavier the scope, the more likely a formal permit is needed.

Structural and External Changes

Removing or altering walls, adding an extension, changing openings, or altering elevations, boundary walls or roofs will normally need drawings and approval before work can begin. We do not treat these as approvable without checking first.

MEP Modifications

Moving drainage, rerouting plumbing, altering distribution boards or adding significant electrical load can bring in extra requirements, including utility approvals where a supply or meter is affected.

Which Authority Applies

Jurisdiction depends on where the villa sits and what is being done. Depending on the community and scope, a project may involve the master developer or community management, Dubai Municipality, Trakhees where the property falls under its jurisdiction, Dubai Civil Defence where fire and life safety is affected, and DEWA where utilities are affected. Not every villa renovation involves all of these.

How We Handle It

At the site visit we confirm which approvals your scope actually needs before the BOQ is finalised, so the requirements and the time they take are known up front instead of surfacing mid-project. Where approvals are required, we coordinate the submissions as part of the project scope.

Why Choose ASM Interiors for Villa Renovation in Dubai?

The most common issues clients report with villa renovation contractors: scope creep after work starts, poor coordination between trades, and finishes not matching what was agreed. We address each directly.

One Team for Full Scope We manage all trades under one contract, including tiling, joinery, MEP, painting, ceilings and finishing. One project manager handles coordination from start to handover.
In-House Joinery Workshop All custom wardrobes, kitchen cabinets, TV units and built-in furniture are manufactured in our own UAE workshop. We do not subcontract joinery production.
Clear BOQ Before Execution A detailed bill of quantities covering every trade, material and rate is issued and signed off before any work starts on site. No surprises during execution.
Dubai Renovation Experience Trading in Dubai since 2014 across apartment and villa renovation, fit-out and joinery. Our completed villa project in Springs 5 covers the kitchen, a bathroom, wardrobe joinery, internal door finishing and exterior painting. Community access procedures and site rules are handled as part of the project.
Material and Finish Guidance We guide clients through tile selection, paint choices, sanitaryware options, joinery finishes and hardware. Physical samples are available before any purchase commitment.
Structured Site Management Works are sequenced correctly across trades. MEP is completed before tiling, joinery is delivered after surfaces are ready, and painting follows all fixing works.
10+ Years Dubai Renovation Experience
Across Dubai Villa Renovation & Fit-Out Projects
In-House Joinery Workshop, UAE Manufactured
1 PM Project Manager Dedicated Per Project

Villa Renovation Across Dubai Communities

ASM Interiors takes on villa renovation work across Dubai. The communities below sit within our normal working area. Access procedures, community guidelines and site logistics are handled as part of the project.

Arabian Ranches
Dubai Hills
Palm Jumeirah
Jumeirah
Springs
Meadows
Emirates Hills
Jumeirah Park
Jumeirah Islands
Al Furjan
Murooj Al Furjan
JVC
Damac Hills
Nad Al Sheba

Recent Villa Project: Springs 5, Dubai

A villa renovation in Springs 5 covering the kitchen, one bathroom, wardrobe joinery, internal door finishing and exterior painting. The kitchen cabinetry and the wardrobe joinery were made in our own workshop, and the bathroom, door finishing and external painting were carried out by the same site team under one contract.

Renovated kitchen with stone peninsula and cove lighting, Springs 5 villa
Exterior painting works at the Springs 5 villa

Frequently Asked Questions: Villa Renovation Dubai

How much does villa renovation cost in Dubai?
Villa renovation costs in Dubai depend on scope, villa size, number of wet areas, material selection, joinery quantity and MEP requirements. As a general guide: partial renovations covering selected areas typically range from AED 80,000–180,000+, standard full renovations from AED 180,000–350,000+, premium renovations from AED 350,000–700,000+, and luxury finishes from AED 700,000+. We provide a detailed BOQ after site inspection and measurement.
How long does a villa renovation take?
Villa renovation timelines depend on scope, villa size and material lead times. A partial renovation covering bathrooms and painting typically takes 6–10 weeks. A full villa renovation covering all areas typically takes 14–22 weeks depending on joinery scope, MEP modifications and finish selections. We prepare a project timeline at the BOQ stage.
Do you handle full villa renovation from start to handover?
Yes. ASM Interiors manages the complete renovation from initial site visit, scope documentation and BOQ preparation through to execution, snagging and formal handover. All trades are managed under one contract by our site team.
Can you renovate bathrooms and kitchens together?
Yes. We routinely manage simultaneous bathroom and kitchen renovation works within the same villa project. Works are sequenced to minimise disruption and ensure MEP, tiling and joinery trades do not conflict with each other.
Do you provide custom joinery for villas?
Yes. All custom wardrobes, kitchen cabinets, TV units, walk-in closets and built-in furniture are designed, fabricated and installed by our in-house joinery team. We do not subcontract joinery production, which gives us direct control over quality and delivery timelines.
Do you handle electrical and plumbing modifications?
Yes. MEP modifications including electrical point additions, switch and socket relocation, lighting circuit changes, plumbing rerouting and drainage adjustments are all managed within our renovation scope. Our licensed team handles this in coordination with tiling and ceiling works.
Do you help with material selection?
Yes. We guide clients through tile selection, paint options, sanitaryware specifications, joinery finishes, countertop materials and hardware choices. Physical samples are available for review before any procurement commitment is made. All selections are confirmed in writing.
Can the client supply tiles and sanitaryware?
Yes. Clients are welcome to supply their own tiles, sanitaryware, fixtures or fittings. We confirm quantities, specifications and delivery requirements at the BOQ stage. Where we procure materials, we present options and confirm selections before ordering.
Do you provide a detailed BOQ?
Yes. A detailed bill of quantities covering every trade, material, rate and timeline is issued before any work begins. Nothing starts on site without written client approval of the BOQ and project timeline.
Do you manage authority or building coordination where required?
Yes. Where villa renovation works require NOC from the community management, building authority approvals or contractor access passes, we coordinate these requirements as part of the project scope. We have experience managing this process across multiple Dubai communities.

Related Renovation Services by ASM Interiors

Planning a full renovation? We offer complete services across kitchens, bathrooms, apartments, villas and custom joinery, all under one contract.

Ready to Start Your Villa Renovation?

Whether you are renovating a single floor or a complete villa, our Dubai team provides a detailed BOQ, transparent pricing and full project management from site visit to handover.